Dimensional resultsFull Dimensional Results
Dimensional inspection is the measurement, against the design record (drawing), of every dimension and characteristic one by one, with every measured value falling inside the tolerance band, submitted as the PPAP "Dimensional Results". The drawing must first beballooningballooned (every dimension given a balloon number), and the number of ledger rows then equals the number of dimensions — the two numbering systems must match so that a measured value can be traced to a specific dimension.
1. Definition and purpose
Why "all dimensions" and not "sampling"
PPAP element 09 requires complete measurement of every dimension and characteristic on the design record, rather than sampling a few key dimensions. The reason: a missed dimension may be exactly the fit / assembly point the customer cares about, and an unnoticed deviation surfaces at vehicle assembly. Balloon the drawing first, one number per dimension; then ledger rows = number of dimensions with numbers matched one to one, so nothing is duplicated, nothing missed, and everything is traceable.
IATF 16949:2016 clause8.6.1requires that "the product is verified to conform to requirements, as planned and at the appropriate stages";8.3.5.1requires that design and development outputs "include or reference … acceptance criteria". Dimensional inspection is the physical evidence for these clauses: every dimension has a nominal value, a tolerance, a measured value, a judgment and a gage record.
Four questions the inspection record must answer
| Question | Answer given by the record |
|---|---|
| What was measured | Dimension number (balloon) corresponds to the drawing, with a clear feature description |
| What it should be | Drawing dimension (nominal value) + tolerance band (direction, size) |
| What it actually is | Measured value + gage + measurement datum, with deviation calculated automatically |
| Can it be submitted | Each dimension judged OK / NG; NG items are dispositioned and closed after re-measurement |
2. Tolerance types and judgment
Five tolerance types and their judgment rules
First determine the tolerance type, then judge OK / NG: for a symmetric tolerance just look at |deviation|; for one-sided / asymmetric tolerances, judge against the upper and lower limits in the right direction. Get the type wrong and every judgment is wrong.
| Type | Expression | Judgment rule |
|---|---|---|
| Symmetric tolerance ± | 12.00 ±0.05 (upper 12.05 / lower 11.95) | Deviation = measured − nominal; |deviation| ≤ tolerance → OK |
| One-sided positive tolerance + | +0.10 / 0 (nominal ≤ measured ≤ nominal + tolerance) | Enter "nominal 0, tolerance = positive tolerance value" and judge deviation ≤ tolerance; or compare against the upper limit |
| One-sided negative tolerance − | 0 / −0.10 (nominal − tolerance ≤ measured ≤ nominal) | Enter "nominal 0, tolerance = absolute value of the negative tolerance" and judge deviation ≥ −tolerance and ≤ 0 |
| Asymmetric tolerance +/− | +0.10 / −0.04 (upper and lower limits differ) | Compare the upper and lower limits separately: upper = nominal +0.10, lower = nominal −0.04 |
| Geometric tolerance (position / flatness) | Flatness 0.05, position Φ0.10 | The measured value is an absolute value compared directly against the tolerance band; in this ledger it is entered as "nominal 0, deviation = measured" |
The symmetric "±" model can only be applied directly where the two directions are equal. For an asymmetric tolerance such as +0.10 / −0.04, entering it as "symmetric ±" in the workbench judges it wrongly — the direction information must be carried in as described in panel 01 (for example by expressing it as nominal 0 plus the tolerance in that direction, or by recording the upper and lower limits). For geometric tolerances (flatness / roundness / position) the measured value is an absolute value and is compared directly against the tolerance band.
3. Ballooning and numbering rules
Balloon first, then register
On the drawing, use a balloon(balloon) to mark every dimension / characteristic with a unique number (D1, D2, …), and the ledger is filled in the same number order.Ledger rows = number of dimensions, with numbers matched one to one. Measuring without ballooning easily leads to missed dimensions, duplicated measurements or mismatched results.
Numbering and registration discipline
4. Sign-off and revision control
The inspection record is also a controlled document
The dimensional inspection record is acontrolled document(IATF 16949 7.5.3 control of documented information): the current revision is controlled, obsolete revisions are withdrawn, and revisions are recorded. None of the three may be missing:
Sign-off page style (the same one built into the workbench)
| Responsibility | Name (signature) | Title | Date | Comment |
|---|---|---|---|---|
| Prepared by | ||||
| Reviewed by | ||||
| Approved by |
The sign-off order cannot skip a level: preparation must be complete before review, and review must pass before approval. After a revision, the original approver (or a delegate) approves again. Once the three-level sign-off is complete, the result is submitted as PPAP element 09 together with the other documents.
5. Common mistakes
① Measuring only key / important characteristics and missing general dimensions, leaving gaps in the PPAP submission; ② balloon numbers do not match ledger row numbers, so measured values cannot be traced to specific dimensions; ③ one-sided / asymmetric tolerances entered as symmetric ±, judging the direction wrongly; ④ measured values carry no datum (the measured face is not stated), so re-measurement cannot be reproduced; ⑤ releasing on a single OK measurement while ignoring the process capability of that dimension (SPC / an initial process study should be run separately).
Pre-submission checklist
6. Self-test
Self-test (5 questions)
Hands-on practice: Dimensional Results workbench
OpenDimensional Results workbench, balloon a real or practice drawing first, then register all dimensions by number, complete the three-level sign-off and export it for archiving; then return toPPAP 18-element ledgerto track the remaining elements.
Based on the AIAG PPAP Manual (4th edition) / IATF 16949:2016 / AIAG APQP Manual (3rd edition, 2024)