Geometric tolerances are defined relative to a datum on the drawing; before measuring, the datum must be simulated on a gauge or CMM — how you simulate it defines what the reading means. The iron rule: datum simulation must reproduce the assembly.
How to simulate
- Planar datum A: granite surface plate (3-point support = the datum simulator, maximum contact) / CMM multi-point fit per the acceptance criterion (least-squares / max-inscribed / min-circumscribed)
- Axis datum B: arbor / CMM cylindrical fit
- Datum targets: ball / line / area supports sized to the drawing
The consequence of not simulating the datums
- Position degenerates into a fake tolerance of “the hole relative to itself”
- The same part measures a factor of two apart between two runs
- Passing and misjudgement come down to luck
A CMM is flexible, but that flexibility is exactly the risk source. Two operators measuring the same drawing often reach different conclusions, almost always falling into the three pitfalls below.
Pitfall 1 · Fitting Method
Maximum inscribed, minimum circumscribed, least squares — different fitting algorithms give different axes and tolerance zones.The acceptance rule determines the fitting algorithm The report must state which was used.
Pitfall 2 · Point Sampling Strategy
A circle measured at 4 points and one at 16 points can yield roundness values differing by 2×. Rule of thumb: at least 7–15 evenly distributed points for form error (roundness / flatness), at least 4 for position; the point count and distribution must be frozen in the measurement plan — never left to the operator. Form error also needs an agreed filter (Gaussian by default) and cut-off wavelength, or you measure form + roughness + noise.
Pitfall 3 · Datum Sequence
CMM software builds the coordinate system in A|B|C order by default, but operators often reorder it when building manually.Off by one place in the datum sequence and the position conclusion is entirely wrong.
Three Questions Every Measurement Plan Must Answer
① Which algorithm/support simulates each datum? ② How many points and how distributed for each measured feature? ③ How is Ⓜ bonus computed (the CMM report must give the post-bonus tolerance)? — Write the answers into the measurement plan and verify against it at review.
Prerequisite: the CMM itself must be accepted / re-verified per ISO 10360, and its MPE is the main source of the measurement uncertainty U — a CMM without an acceptance report cannot support a conformance decision.
A position gauge is the hardware embodiment of Ⓜ: gauge pin diameter = Virtual assembly boundary Ø(H−t); if it inserts, it passes — size and position are accepted in one 'insert', exactly the benefit of Ⓜ decoupling the two variables into one boundary.
Advantages
- Fast: 10 seconds per part on the floor
- Stable: does not rely on operator skill
- Accurate: accepts the assembly function directly
Cost and Boundaries
- Gives only GO/NO-GO, no values (no process-improvement information)
- One gauge per part; the moulding cost is high
- Gauge tolerance = 10% of the part tolerance plus a wear allowance; the gauge itself is verified periodically (GB/T 1958)
The runout measuring setup is the definition itself: double centers / V-block rotate about the datum axis, and the dial-indicator spread is the error — inspection is cheap enough for 100% full check.
What if CMM and gauge disagree (arbitration rules)
- Look at the drawing conventions: if the drawing specifies the inspection method/gauge scheme, follow the drawing; otherwise follow the standard default (CMM fitting rules).
- Look at the datum simulation: the conclusion closer to the assembly state takes priority — the functional gauge is usually closest.
- Look at the measurement uncertainty: when the reading falls in the indecision zone (spec limit ± U) it is 'measurement ambiguity' — resolve per ISO 14253-1 by agreement with the customer (framework in the Advanced module).
- The arbitration sequence is written into the supplier agreement: agree first, argue later — a basic skill of the SQE.
Every line of a CMM report is a translation of a tolerance frame. Understand the three steps below and you'll see why 'results change after re-fixturing' is not instrument drift.
| Step | Action | Common Newcomer Errors |
|---|---|---|
| 1. Establish the Datum Reference Frame (DRF) | Fit the datum planes / axes in the order A→B→C | Get the datum sequence wrong and the whole data set must be recomputed |
| 2. Align the part | Rotate the measured coordinates onto the theoretical coordinates | Choosing the wrong fitting algorithm (least squares / maximum inscribed) |
| 3. Measure features and compute the deviation | Compute position / profile from the feature control frame | Overlooking the stack-up of form error |
Grey zone of judgement: independence principle vs boundary method
Size tolerance defaults to the independence principle (ISO 8015; ASME calls it RFS): each section is judged independently and must not exceed the two-point size limit. Once Ⓜ/Ⓛ is added, the MMR/LMR boundary method applies: as long as the virtual boundary is not breached it passes, even if a local size is out of tolerance. For the same part, the two interpretations may reach opposite conclusions — exactly the microscopic scene of 'standards differences cause accidents' mentioned in PE-00.
Iron Rules of Acceptance
The report must state the tolerance principle used (independence / boundary method) and the datum order; change any item and the old report is void and must be re-measured. Don't use 'all dimensions OK' as a release reason.
Conformance decisions: ISO 14253-1 acceptance and indecision zones
A reading cannot be compared with the spec limit directly — every measurement carries an uncertainty U. ISO 14253-1 contracts / expands the spec limits by U on both sides, deciding by the default "shared risk" rule:
| Zone | Definition | Decision |
|---|---|---|
| Acceptance zone | spec limit contracted inward by U | inside → conform |
| Indecision zone | band of spec limit ± U | inside → no decision possible; negotiate between supplier and customer |
| Rejection zone | spec limit expanded outward by U | beyond → non-conform |
y + U ≤ upper spec limit → conform
y − U ≥ upper spec limit → non-conform
otherwise (the spec limit falls between y±U) → indecision zone, negotiateSources of U: the CMM's MPE (ISO 10360), deviation from the 20 °C reference temperature, probing error, the fitting algorithm, and the sampling / filtering strategy — which is why the acceptance zone is narrower than the specification zone. How much to tighten or loosen it is agreed between supplier and customer in the contract.
Take Away in One Sentence
Inspection = Reproduce the drawing constraints in hardware: datum simulation reproduces assembly, CMM outputs numbers, the functional gauge outputs GO/NO-GO; whichever is closer to assembly behavior has the harder conclusion.
Further Reading
- PE-04 Tolerance Stack-up Analysis — where do the tolerance numbers come from.
- Standards: ISO 5459 (datum simulation), ISO 14253-1 (conformance decisions), ISO 10360 (CMM acceptance), GB/T 1958 (inspection rules), ASME Y14.5.1 (mathematical definition).
© 2026 PanShu / 潘书 · QualEngine | PE-03 training page.