QualEngine Training / Product Engineering / Inspection and Verification
Datum Simulation: reproduce first, then measureIron Rule

Geometric tolerances are defined relative to a datum on the drawing; before measuring, the datum must be simulated on a gauge or CMM — how you simulate it defines what the reading means. The iron rule: datum simulation must reproduce the assembly.

How to simulate

  • Planar datum A: granite surface plate (3-point support = the datum simulator, maximum contact) / CMM multi-point fit per the acceptance criterion (least-squares / max-inscribed / min-circumscribed)
  • Axis datum B: arbor / CMM cylindrical fit
  • Datum targets: ball / line / area supports sized to the drawing

The consequence of not simulating the datums

  • Position degenerates into a fake tolerance of “the hole relative to itself”
  • The same part measures a factor of two apart between two runs
  • Passing and misjudgement come down to luck
Contact statePer ISO 5459 the datum simulator contacts the datum feature at maximum contact: external (shaft), internal (hole), tangential (plane). The gauge's support points / locating blocks are the physical realisation of the datum simulator; a common datum A-B needs both simulators engaged at once, taking the common axis (marking: see PE-02).
Free stateSheet-metal parts (the EV-Box cover) must distinguish free state vs constrained state (ISO 10579): position opens up in the free state; when the drawing marks Ⓕ, measure with the part constrained by the datum targets.
Enter: CMM Strategy →
CMM Measurement StrategyThree Pitfalls

A CMM is flexible, but that flexibility is exactly the risk source. Two operators measuring the same drawing often reach different conclusions, almost always falling into the three pitfalls below.

Pitfall 1 · Fitting Method

Maximum inscribed, minimum circumscribed, least squares — different fitting algorithms give different axes and tolerance zones.The acceptance rule determines the fitting algorithm The report must state which was used.

Pitfall 2 · Point Sampling Strategy

A circle measured at 4 points and one at 16 points can yield roundness values differing by 2×. Rule of thumb: at least 7–15 evenly distributed points for form error (roundness / flatness), at least 4 for position; the point count and distribution must be frozen in the measurement plan — never left to the operator. Form error also needs an agreed filter (Gaussian by default) and cut-off wavelength, or you measure form + roughness + noise.

Pitfall 3 · Datum Sequence

CMM software builds the coordinate system in A|B|C order by default, but operators often reorder it when building manually.Off by one place in the datum sequence and the position conclusion is entirely wrong.

Three Questions Every Measurement Plan Must Answer

① Which algorithm/support simulates each datum? ② How many points and how distributed for each measured feature? ③ How is Ⓜ bonus computed (the CMM report must give the post-bonus tolerance)? — Write the answers into the measurement plan and verify against it at review.

Prerequisite: the CMM itself must be accepted / re-verified per ISO 10360, and its MPE is the main source of the measurement uncertainty U — a CMM without an acceptance report cannot support a conformance decision.

Enter: Functional Gauges →Back to Datum Simulation →
Functional Gauge (Position Gauge)Ⓜ In Hardware Form

A position gauge is the hardware embodiment of Ⓜ: gauge pin diameter = Virtual assembly boundary Ø(H−t); if it inserts, it passes — size and position are accepted in one 'insert', exactly the benefit of Ⓜ decoupling the two variables into one boundary.

Position Gauge (Functional Gauge) · top viewGauge body90Locating pin Ø6.25Pin diameter = hole MMC = boundary sizeVerdict: the part is GO once it seatsPart (dashed line)Clearance ring = bonusAll pins enter → GOAny pin stuck → NOK
Position-gauge principle: pins are laid out on the gauge plate at TED positions (diameter = boundary Ø6.25); the base simulates A|B|C datums. Part seats and pins insert simultaneously = pass; won't insert = rejected regardless of hole size.

Advantages

  • Fast: 10 seconds per part on the floor
  • Stable: does not rely on operator skill
  • Accurate: accepts the assembly function directly

Cost and Boundaries

  • Gives only GO/NO-GO, no values (no process-improvement information)
  • One gauge per part; the moulding cost is high
  • Gauge tolerance = 10% of the part tolerance plus a wear allowance; the gauge itself is verified periodically (GB/T 1958)
Enter: Runout and Arbitration →Back to CMM →
Runout Inspection · CMM vs Gauge ArbitrationThe reading is the acceptance

The runout measuring setup is the definition itself: double centers / V-block rotate about the datum axis, and the dial-indicator spread is the error — inspection is cheap enough for 100% full check.

Circular runout setup (two centers + indicator)Centre pointCentre pointADatum A: the centre-pick axisMicrometerRotate through one full turn about datum AMeasure several sections segment by segment and take the largest reading differenceKey points· Datum axis simulated by two centers· (consistent with assembly rotation behavior)· Indicator spread = runout error· Catches both roundness and coaxiality· One setup, best cost-performance
Runout setup: the part rotates about datum axis A; the indicator reads max–min difference at the specified section / full length. Indicator base, datum simulation and reading method are one integrated whole.
Circular vs total runoutCircular runout: the indicator stays on a single section while the part turns one revolution; the max–min difference must be ≤ tolerance. Total runout: the indicator traverses the whole surface axially (part rotating, indicator base moving along the axis); the full-travel difference must be ≤ tolerance — the hardware difference is exactly whether the indicator base moves along the axis.

What if CMM and gauge disagree (arbitration rules)

  • Look at the drawing conventions: if the drawing specifies the inspection method/gauge scheme, follow the drawing; otherwise follow the standard default (CMM fitting rules).
  • Look at the datum simulation: the conclusion closer to the assembly state takes priority — the functional gauge is usually closest.
  • Look at the measurement uncertainty: when the reading falls in the indecision zone (spec limit ± U) it is 'measurement ambiguity' — resolve per ISO 14253-1 by agreement with the customer (framework in the Advanced module).
  • The arbitration sequence is written into the supplier agreement: agree first, argue later — a basic skill of the SQE.
Enter: Key Points →Back to Gauges →
Advanced: CMM Datum Simulation and the Decision FrameworkWhy the result changes with a different setup

Every line of a CMM report is a translation of a tolerance frame. Understand the three steps below and you'll see why 'results change after re-fixturing' is not instrument drift.

StepActionCommon Newcomer Errors
1. Establish the Datum Reference Frame (DRF)Fit the datum planes / axes in the order A→B→CGet the datum sequence wrong and the whole data set must be recomputed
2. Align the partRotate the measured coordinates onto the theoretical coordinatesChoosing the wrong fitting algorithm (least squares / maximum inscribed)
3. Measure features and compute the deviationCompute position / profile from the feature control frameOverlooking the stack-up of form error

Grey zone of judgement: independence principle vs boundary method

Size tolerance defaults to the independence principle (ISO 8015; ASME calls it RFS): each section is judged independently and must not exceed the two-point size limit. Once Ⓜ/Ⓛ is added, the MMR/LMR boundary method applies: as long as the virtual boundary is not breached it passes, even if a local size is out of tolerance. For the same part, the two interpretations may reach opposite conclusions — exactly the microscopic scene of 'standards differences cause accidents' mentioned in PE-00.

Iron Rules of Acceptance

The report must state the tolerance principle used (independence / boundary method) and the datum order; change any item and the old report is void and must be re-measured. Don't use 'all dimensions OK' as a release reason.

Conformance decisions: ISO 14253-1 acceptance and indecision zones

A reading cannot be compared with the spec limit directly — every measurement carries an uncertainty U. ISO 14253-1 contracts / expands the spec limits by U on both sides, deciding by the default "shared risk" rule:

ZoneDefinitionDecision
Acceptance zonespec limit contracted inward by Uinside → conform
Indecision zoneband of spec limit ± Uinside → no decision possible; negotiate between supplier and customer
Rejection zonespec limit expanded outward by Ubeyond → non-conform
Decision rule (shared risk; y = reading, U = expanded uncertainty, k=2)
y + U ≤ upper spec limit → conform
y − U ≥ upper spec limit → non-conform
otherwise (the spec limit falls between y±U) → indecision zone, negotiate

Sources of U: the CMM's MPE (ISO 10360), deviation from the 20 °C reference temperature, probing error, the fitting algorithm, and the sampling / filtering strategy — which is why the acceptance zone is narrower than the specification zone. How much to tighten or loosen it is agreed between supplier and customer in the contract.

Key Points & ChecklistTake Away on One Page
Reproduce the datums before measuring: if datum simulation doesn't reproduce assembly, the reading is meaningless.
State the fitting algorithm in the report: without stating max-inscribed/least-squares, the conclusion cannot be arbitrated.
Freeze the sampling strategy in the plan: point count and distribution must not be decided by the operator on the spot.
Not a single datum in the sequence may be wrong: CMM coordinate-system order = drawing A|B|C.
Ⓜ The report must give the tolerance after bonus: reporting only raw deviation without bonus equals not inspecting to the drawing.
The gauge is a direct acceptance of function: fast and stable, but loses numerical information; use the two together.
The arbitration rule is agreed in advance: write it into the supplier agreement; no on-the-spot judging.
Decide conformance per ISO 14253-1: conform / indecision / non-conform by zone — never compare a bare reading with the spec limit.

Take Away in One Sentence

Inspection = Reproduce the drawing constraints in hardware: datum simulation reproduces assembly, CMM outputs numbers, the functional gauge outputs GO/NO-GO; whichever is closer to assembly behavior has the harder conclusion.

Further Reading

  • PE-04 Tolerance Stack-up Analysis — where do the tolerance numbers come from.
  • Standards: ISO 5459 (datum simulation), ISO 14253-1 (conformance decisions), ISO 10360 (CMM acceptance), GB/T 1958 (inspection rules), ASME Y14.5.1 (mathematical definition).

© 2026 PanShu / 潘书 · QualEngine | PE-03 training page.

Back to the top →