QualEngine Product Engineering / GD&T · DFM-A Glossary

GD&T / DFM-A Quick Glossary

Common terms for geometric tolerancing (ISO GPS) and design for manufacturing/assembly, shown side by side in Chinese and English for easy comparison. Full explanations on training pages PE-00 Overview, PE-10 Rule Library, etc.; calculators on Tolerance Stack-up Calculator and DFM/DFA Checklists.

1. Geometric Tolerancing GD&T and ISO GPS

TermEnglish
GD&TGPSGeometric Dimensioning & Tolerancing — a symbolic language defining geometry (called GPS under ISO).
DatumA reference point/axis/plane (A/B/C) for locating the part.
Datum Reference Frame (DRF)Datum Reference Frame — 3-2-1 locators constrain all six degrees of freedom.
Feature Control FrameFeature Control Frame — geometric symbol + tolerance + datum letters.
14 geometric characteristics14 characteristic symbols across form, orientation, location, profile, runout.
Ⓜ MMCMaximum Material Condition — feature at its largest/smallest allowed size (most material).
Ⓛ LMCLeast Material Condition — feature at its least-material size.
RFS Independence PrincipleRegardless of Feature Size — geometric tolerance is constant, independent of size.
Virtual Condition (VC)Virtual Condition — fixed boundary (MMC ± geometric tol) used to size go/no-go gauges.
Bonus ToleranceBonus tolerance — extra geometric tolerance gained as the feature departs from MMC.
PositionPosition tolerance — zone controlling a feature's center from its true position.
ProfileProfile — bidirectional zone about a true profile (with or without datum).
RunoutRunout — total/circular variation while rotating about a datum axis.
Envelope PrincipleEnvelope Principle — size tolerance's MMC boundary contains the feature form.

2. Design for Manufacture and Assembly DFM / DFA

TermEnglish
DFMDesign for Manufacturing — make parts easy and cheap to produce.
DFADesign for Assembly — ease assembly and reduce part count.
Part Minimisation RatePart-minimization rate η = 1 − Nafter/Nbefore.
Assembly Efficiency IndexAssembly Efficiency EMA = min operations / actual operations (→1 best).
Poka-YokeError-proofing — design that prevents mistakes by structure (e.g. asymmetric locating).
Tolerance Stack-upTolerance chain — multiple tolerances accumulating along an assembly direction.
Economic ToleranceEconomic tolerance — optimum band balancing production cost vs quality loss.
Process-Specific Rule LibraryPer-process rule sets for machining / sheet-metal / injection / assembly.
Key CharacteristicsCritical Characteristic — safety/function-critical; one-vote-veto in the checklist.

3. PCBA Design, Process, Test and Reliability

TermEnglish
PanelPanel — several boards linked for throughput; ≥5 mm rail with fiducials.
FiducialFiducial — optical reference marks for placement alignment.
Thermal ReliefThermal relief — spokes between pad and plane to prevent heat-sink cold joints.
Thermal PadThermal pad — solid copper area under BGA/QFN for heat spreading and high current.
Keep-outKeep-out area — zones (edge, under connectors, BGA shadow) where no parts/traces.
TPTest point — reserved probe pads for ICT / flying-probe test.
BGABall Grid Array — bottom-array pins; keep reworkable parts out of its shadow.
FPYFirst Pass Yield — share made right first time; core SMT quality metric.
ARAreal Ratio — aperture area / wall area; ≥0.66 for consistent transfer, <0.60 risks insufficient solder.
TALTime Above Liquidus — controls wetting and IMC thickness; typically 45–90 s.
SoakSoak zone — equalizes temperature before reflow; insufficient soak causes BGA voids.
TETransfer Efficiency — actual vs theoretical paste volume; core SPI metric.
JTAGJTAG boundary scan — tests interconnects via IEEE 1149.1 without physical pads.
ESSEnvironmental Stress Screening — pre-shipment cycling and vibration to catch early-life failures.
LCFLow-Cycle Fatigue — cyclic plastic strain from CTE mismatch; dominant joint failure mechanism.
Dye & PryDye & Pry — dye enters cracks, part is pried open; locates failed joints (destructive).

PCBA design rules and the EV-Box BMS case: PE-13 PCBA Manufacturability & Assemblability; the process, test and reliability loop: PE-14 Soldering Process · PE-15 Test Strategy · PE-16 Reliability Verification; interactive checklist: the “PCBA” branch of the DFM/DFA checklist.

This table is a quick reference; definitions follow the training pages and the original ISO GPS / ASME Y14.5; the EV-Box battery pack case runs through PE-00~16.