Control Plan
A Control Plan is a structured document that describes product and process parameters, the control method for each parameter, and the reaction plan to be executed when the process or product fails. It is the master control drawing for the shop floor: it takes the PFMEA risk priorities above and feeds the work instructions and inspection specifications below. The Control Plan supports IATF 16949:2016 Clause 8.5.1.1 (Control Plan), is PPAP element 7, and is the starting point for process audits and layered audits.
Purpose and Value
- Risk lands in practice: turn the failure risks of the PFMEA into control points that can be executed on the shop floor
- Consistency: operations, characteristics and sampling are unified across the Process Flow / FMEA / Control Plan
- Out-of-control response: makes explicit “who does what” to contain suspect product and restore control
- Audit Baseline: process audits (including LPA) use the Control Plan as the benchmark
- The carrier for PPAP: the production Control Plan is element 7 of PPAP
Common Misconceptions
- Treating the Control Plan as a record form, filled in once and never updated, out of step with the shop floor
- The Reaction Plan states “Notify the team leader” — too vague, with no concrete containment steps
- Sampling by time (one part per hour) rather than by production quantity
- Special characteristics not marked, or symbols inconsistent with the drawing / PFMEA
- Operation numbers that do not match across the Control Plan, PFMEA and Process Flow
| # | Problem | Corresponding Header Column |
|---|---|---|
| 1 | What is controlled: which product / process characteristics | Col. 4 Characteristic |
| 2 | Where it is controlled: which operation / equipment | Cols. 1–3 Process / Equipment |
| 3 | How it is measured: what gauge / method is used | Col. 5 Evaluation / Measurement |
| 4 | How much is controlled: how many to sample and at what frequency | Cols. 6–7 Sample Size / Frequency |
| 5 | How it is prevented: what control method is used | Col. 8 Control Method |
| 6 | What to do when control is lost: action + who is responsible | Cols. 9–11 Reaction / Symbols / Owner |
| Dimension | Control Plan | Work Instruction (WI) |
|---|---|---|
| Perspective | “what to control, how to control it, and what to do when it goes out of control” | “how to operate it step by step” |
| Object | Characteristic and Risk | Operation actions and sequence |
| Reaction Plan | contains (action + owner) | Generally not included; points to the CP |
| Level | Management / Engineering Documents | Execution-Layer Documents |
| Relationships | The CP is the control basis for the WI | The WI implements the control requirements of the CP |
The Control Plan evolves as APQP advances, producing three formats for different stages.The 2024 1st Edition adds the “Safe Launch” Control Plan, used for enhanced containment during the approximately 90-day ramp at the start of production.
| Shape | Corresponding APQP stage | When to use | Control Intensity |
|---|---|---|---|
| Prototype | Stages 1–2 | Prototype build, dimensional / performance verification | Low-frequency sampling focused on dimensions and material |
| Pre-Launch | Stage 3 | Pre-launch run to verify process capability | Tightened sampling to verify MSA and Cpk |
| Production | Stage 4 (PPAP element 7) | Formal production control | Sampling by quantity + a routine Reaction Plan |
| Safe Launch (new) | Stage 4→5 ramp period | Enhanced containment during the approximately 90-day ramp after production start | additional containment + 100% inspection, may be merged with the Pre-Launch version |
Why it is needed
Early after a new part or process enters production the process is not yet fully stable and latent failures are not yet fully exposed. Safe Launch applies about 90 days of strengthened containment, safeguarding quality during the highest-risk period.
Typical Tightening Measures
- Key Characteristics 100% inspection or tightened sampling
- Accelerated reaction: shorten reaction time and raise the escalation level
- Additional identification / quarantine area so that suspect batches can be traced
- More frequent process monitoring and first-off confirmation
The 1st Edition of the AIAG Control Plan Manual, published 2024-03Published as a standalone manual, replacing the Control Plan chapter of APQP 2nd Edition Appendix A and PPAP 4th Edition. The following 14 items are the core updates compared with the previous edition.
| Dimension | Old edition | 2024 1st Edition |
|---|---|---|
| Published as a standalone manual | Attached to APQP / PPAP | A standalone sixth core tool |
| Shape | Prototype / Pre-Launch / Production | Adding Safe Launch |
| Header Column | approximately 10 columns | 11 columns (Ownership added) |
| Checksheet | 10 items | 21 Items |
| Sampling | Often set by time | By production quantity |
| Reaction Plan | Single description | Action + Owner, two columns |
7. Bring rework / repair under control
Rework / repair must have a standalone Control Plan approved by the customer; Rework must also be controlled, with the method, inspection and traceability made explicit so that the repair does not introduce new risk.
8. Non-value-adding processes
Transport / storage / handling add no value but affect quality (impact, mixed material, deterioration). Their risks must be identified and protection and monitoring established in the Control Plan.
13. Software-based development
Software (such as a customer-specified system) may be used to develop and manage the Control Plan, improving revision consistency and linkage efficiency, while ensuring that review / approval stays under control.
14. Family Control Plan
A Family Control Plan uses one plan to cover a family of similar parts, from which part-level plans are derived; it suits high-mix low-volume production, but derivation must ensure no characteristic is lost.
| process | Typical Risks | Control within the Control Plan |
|---|---|---|
| Handling | Impact, drop, mixed material | Designated equipment / route, FIFO, anti-mixing identification |
| Storage | Corrosion, deterioration, expiry | Temperature and humidity, shelf life, first in first out |
| Transport | Vibration, rain, loss | Packaging specifications, protection, in-transit monitoring |
| Dimension | Rework | Repair |
|---|---|---|
| Definition | Restore conformance to the original specification (without changing the design) | Repaired until usable, possibly deviating from the original specification |
| Control Plan | must be controlled, with the method / inspection / traceability made explicit | must have a standalone Control Plan and be approved by the customer |
| Risk | Introduces new variation | A permanent deviation is possible and requires customer recognition |
The 2024 1st Edition consolidates the old approximately 10 columns into 11 Columns, the key change is the addition of ‘Owner (Ownership)” columns, and presents the Reaction Plan explicitly as the two columns “action + owner”. The 11 column definitions follow.
| # | Column Name | English | How to Complete |
|---|---|---|---|
| 1 | Part / process number | Part / Process No. | Corresponds to the operation numbers in the Process Flow Diagram and PFMEA; all three must be consistent |
| 2 | Process name / Operation description | Process Name / Operation | What this operation does (e.g. injection molding, welding, final assembly) |
| 3 | Machine / Equipment / Fixture / Tooling | Machine / Device / Jig / Tool | The equipment and tooling used, numbered for traceability |
| 4 | Characteristic (number / name / specification and tolerance) | Characteristic | Product and process characteristics, with number, name and specification / tolerance |
| 5 | Evaluation / Measurement Technique | Evaluation / Measurement | Gauge / method (e.g. CMM, torque gun, visual) |
| 6 | Sample size | Sample Size | Sample quantity per batch (e.g. 5 parts per batch) |
| 7 | Sampling frequency | Frequency | By production quantity(e.g. every 500 parts), not by time |
| 8 | Control Method | Control Method | SPC, mistake-proofing, 100% inspection, first-off / last-off checks, etc. |
| 9 | Reaction Plan (action + owner) | Reaction Plan | Concrete containment actions + responsible role when out of control (two columns) |
| 10 | Special Characteristic Symbols | Special Char. Symbol | ◇/▽ etc., consistent with the drawing and PFMEA |
| 11 | Owner (Ownership) | Ownership | Process owner / responsible role for this row (new in 2024) |
| Process step | Operation | Equipment | Characteristic | Measurement | Sample | Frequency | Control Method | Reaction Plan | Symbol | Owner |
|---|---|---|---|---|---|---|---|---|---|---|
| OP30 | Torque tightening | Servo tightening gun #2 | Torque 45±3 N·m | Torque gun reading | 1 part | Every 50 parts | SPC + mistake-proofing against missing tightening | Quarantine the suspect parts + notify the team leader (Mr. Zhang) | ◇ | Assembly team leader |
| Control Method | Description | Applicable |
|---|---|---|
| SPC | Monitor process variation with control charts | Measurable key / significant characteristics |
| Mistake-proofing (Poka-Yoke) | Physical or logical poka-yoke on equipment so that errors cannot escape | High risk of assembly errors or missed inserts |
| 100% inspection | 100% inspection (commonly used for Safe Launch / special characteristics) | High severity, during Safe Launch |
| First-off / Last-off Inspection | First-off and last-off confirmation per shift / per die change | Processes with frequent changeovers |
| In-process check / sampling | Sampling by quantity (not by time) | General characteristics |
In addition to the 11-column table, each Control Plan cover sheet must have a management information block to ensure traceability and control.
| Information item | Description |
|---|---|
| Part / name / specification | Part number, name, latest engineering revision level |
| Control Plan Number / Revision | Unique number and revision; any change requires a revision increment |
| Shape | Prototype / Pre-launch / Production / Safe Launch |
| Key Contacts | Prepared, reviewed, approved and customer SQE |
| Date | Prepared / Effective Date |
| Customer Engineering Approval | Attach the customer signature if required |
In a Control Plan, characteristics are divided into general characteristics and special characteristics. Special characteristics stem from processes with high severity (safety / regulatory); they must be identified and under tightened control;Pass-Through Characteristic (PTC) is a new concept emphasised in the 2024 Edition — its control effectiveness is determined by the downstream process.
Special Characteristic Identification
- ◇ Diamond: Safety Characteristic (Safety)
- ▽ Inverted triangle: Regulatory Characteristic (Regulatory)
- Severity 9–10 must be identified as a special characteristic in the Control Plan
- Symbols must agree with the drawing, DFMEA / PFMEA
Pass-Through Characteristic (PTC)
- Pass-Through Characteristics: an upstream characteristic can only be met through a downstream process
- Its control effectiveness is determined by the downstream process; control by the upstream alone is insufficient
- A control agreement must be reviewed and agreed with the customer
- e.g. a dimensional clearance can only be verified through the assembly process
| Requirement | Description |
|---|---|
| Identification | Column 10 is marked with ◇/▽, with the symbol shown alongside the characteristic name |
| Tightened sampling | The sampling frequency for special characteristics is usually higher than for general characteristics, with 100% inspection where necessary |
| Reaction Plan | must have concrete containment + recovery steps and a designated owner |
| Mistake-proofing | Prefer mistake-proofing (Poka-Yoke) and confirm its effectiveness |
| Runs throughout | The chain Drawing → FMEA → Control Plan → Work Instruction carries everything through without loss |
| Process step | Operation | Characteristic | Measurement | Sample | Frequency | Control Method | Reaction Plan | Symbol | Owner |
|---|---|---|---|---|---|---|---|---|---|
| OP10 | Stamping / forming | Mounting hole position 12±0.3 mm | Checking Aids | First-off + 1 | Every 200 parts | Mistake-proofing + SPC | Quarantine the last 200 inspected parts + notify Process Engineering (Mr. Li) | ▽ | Stamping team leader |
| OP20 | Welding | Weld strength (safety) | Destructive test | 1 | Every 100 parts | Welding parameter monitoring + destructive test | Stop the line + quarantine the entire batch + notify Quality (Mr. Wang) | ◇ | Welding team leader |
How Black Box processes are controlled
Where the internal details of a process are invisible to the supplier (such as an outsourced Black Box process), the Control Plan requirements for that process must still be met: inputs, outputs, characteristics and Reaction Plans must be made explicit and agreed with the customer. Loss of control must not be tolerated just because it is “not visible”.
The Reaction Plan is column 9 of the Control Plan; the 2024 Edition requires it to be broken down into two columns, “Action” and “Owner”. Their purpose is: when the process or product goes out of control, immediately contain the suspect / nonconforming product, stop the process from producing more, and stabilise it before control is restored.
The Three Elements of a Qualified Reaction Plan
- Contain: quarantine / identify suspect product so that it cannot reach the next operation or the customer
- Prevent: stop the line or switch over, preventing the process from producing more nonconforming parts
- Recover: production may only resume after the root cause is eliminated and stability is verified
- All of the above must designate the responsible person (role / name)
Unqualified Reaction Plan (bad example)
- Only “notify the team leader” — no concrete containment action
- Only “adjust the equipment” — no disposition of suspect product
- No owner — it is unclear who acts
- No recovery criteria — there is no basis for when to resume production
| Out-of-control situation | Bad example (too vague) | Good example (action + owner) |
|---|---|---|
| Torque out of tolerance | Notify the team leader | Immediately quarantine the parts assembled this shift + stop the line + notify the assembly team leader (Mr. Zhang) to re-tighten and verify; resume once SPC is stable |
| Dimensional drift | Adjust the tooling | Quarantine the last 50 inspected parts + notify Process Engineering (Mr. Li) to adjust the die; production may only resume after the first-off passes and 5 consecutive parts pass |
| Appearance defect | Sort out the defects | 100% visual sorting + notify Quality (Mr. Wang) to start the limit-sample comparison, and hold external shipment |
Effectiveness verification
A mistake-proofing device is not effective merely by being installed. One must specify a verification method (such as periodically introducing known defects) and a verification frequency, confirming it can genuinely intercept errors.
Red Rabbit
Test the mistake-proofing periodically with known-defect standard samples: if it does not alarm, the device has failed and immediate reaction is required. Red Rabbit samples must be under controlled management and be numbered for traceability.
| Level | Trigger | Action |
|---|---|---|
| Front line | A single part / batch out of tolerance | The operator contains per the Reaction Plan and notifies the team leader |
| Middle management | Recurring / adverse trend | Stop the line; Quality / Process Engineering intervene; launch 8D |
| Senior management | Involving safety / regulatory or customer-side | Escalate to management + notify the customer SQE, recall if necessary |
The Control Plan is a dynamic document, not something compiled once and then locked. IATF 16949:2016 Clause 8.5.1.1 and the 2024 Edition manual require the Control Plan to be reviewed and updated whenever any of the following occurs.
| Step | Action |
|---|---|
| Identify the trigger | determine which of the above review triggers applies |
| Review the impact | Assess the impact on characteristics, methods, sampling and Reaction Plans |
| Revised document | Update the Control Plan under version control, with traceable number / revision |
| Linked updates | Update the PFMEA, Process Flow Diagram and work instruction in step |
| Approval and release | Approved by the owner / customer (as required) and trained before working |
| PPAP resubmission | Where the case is a PPAP submission case, resubmit per Section 3 |
Reverse FMEA
Working backwards from actual on-floor practice: do the Control Plan / PFMEA cover all real failure modes? Any gap found is written back into the FMEA and Control Plan, forming a closed loop.
Layered Process Audit (LPA)
Managers at different levels go to the shop floor at a fixed frequency to verify line by line whether the Control Plan is being executed. Focus on whether the Reaction Plans, mistake-proofing and sampling are genuinely implemented.
The following are the most common errors in Control Plan preparation and maintenance, ranked by frequency in audits.
- InconsistentDoes not match the operations in the PFMEA / Process Flow: the operation numbers and operation descriptions do not correspond across the three documents.
- Not markedSpecial Characteristics Not Marked: the drawing / PFMEA marks ◇/▽ but the Control Plan does not, or the symbols are wrong.
- Too vagueReaction Plan too vague: only “notify the team leader”, with no concrete containment + recovery steps and no owner.
- SamplingBy time rather than by quantity: writing “one part per hour” violates the 2024 Edition requirement to sample “by production quantity”.
- Two sets of realityThe document is disconnected from the shop floor: the Control Plan states 100% inspection but it is not actually done on the floor.
- Mistake-proofingMistake-proofing not verified: mistake-proofing was installed but with no effectiveness verification method or frequency, and no Red Rabbit samples.
- PTCPTC without agreement: pass-through characteristics not reviewed with the customer and with no control agreement.
- Black BoxBlack Box process without sub-supplier assurance: a process invisible to the supplier does not satisfy the CP requirements and is not agreed by the customer.
| Case | Problem | Root cause | Correction |
|---|---|---|---|
| Case A Welding operation | The Control Plan states “first-off per shift + SPC”, but on the floor one part is actually pulled every hour by time | The sampling frequency follows time rather than production quantity, and SPC is not genuinely running | Changed to an “every 200 parts” frequency, restore the X-bar R chart, LPA weekly checks |
| Case B Assembly line | The Reaction Plan for torque out of tolerance only says “notify the team leader”; the line was not stopped for two hours after control was lost | The Reaction Plan has no concrete containment / recovery steps and no owner | Rewritten as “quarantine this shift's parts + stop the line + Mr. Zhang re-tightens + resume once stable” |
APQP — Advanced Product Quality Planning
The Control Plan runs through APQP stages 2/3/4; Safe Launch bridges stage 4→5.
See Part 16PPAP — Production Part Approval Process
The Control Plan is element 7 of PPAP; the production version of the CP is submitted with the PPAP.
See Part 17PFMEA — Process Failure Analysis
The characteristics and sampling of the Control Plan come from the risk priorities of the PFMEA.
Process Flow Diagram
The operation number in column 1 of the Control Plan must match the Process Flow Diagram exactly.
MSA / SPC
Measurement Systems Analysis and Statistical Process Control support the sampling and capability of the CP.
LPA — Layered Process Audit
The 2024 Edition introduces layered audits as an on-floor verification method for Control Plan effectiveness.
The touchstone of a Control Plan: is there someone who acts the moment control is lost?
A good Control Plan is not written to be “read”; it is written to be “used” at the moment the process goes out of control. Whether the Reaction Plan lets the shop floor contain, prevent and recover immediately is the only hard measure of Control Plan quality.
The 2024 1st Edition expands the Control Plan checklist from the old 10 items to 21 Items. The table below summarises the key items (for the complete 21 items, refer to the manual's checklist); each item should be verified after the Control Plan is prepared.
| Category | Verification Points (Summary) |
|---|---|
| overall | Consistent with the operations in the PFMEA / Process Flow; revision under control; covers the entire manufacturing process |
| Characteristic | Special characteristics identified (◇/▽); PTC identified and agreed with the customer; Black Box processes agreed |
| method | Sample by production quantity; the control method is sound (SPC / mistake-proofing / 100% inspection); mistake-proofing is verified |
| Reaction Plan | Action + Owner are both present; immediately executable; includes containment / prevention / recovery |
| New format | Safe Launch is defined (where applicable); the rework / repair plan is complete and customer-approved |
| Responsibility and Verification | The Ownership column is filled; Reverse FMEA / LPA verification is done; non-value-adding processes are under control |
The following is the item-by-item list of the 21 items, corresponding one to one with the checklist items on the Control Plan CP workbench page; it is recommended that each item be verified and the record retained once the Control Plan is prepared.
| # | Verification Point |
|---|---|
| 1 | The Control Plan is approved by an authorized person, with a clear revision number and effective date |
| 2 | Process numbers fully consistent with the Process Flow Diagram and PFMEA |
| 3 | Every operation has a corresponding process name and operation description |
| 4 | Machines / devices / fixtures / tooling are listed and match the shop floor |
| 5 | Characteristic numbers correspond one-to-one with PFMEA characteristic numbers |
| 6 | Product characteristics are complete; dimensions include every critical item required by the drawing |
| 7 | Process characteristics cover every parameter that affects product characteristics |
| 8 | Special characteristics are identified by customer symbols (column 7) |
| 9 | Pass-Through Characteristics (PTC) have been passed down the supply chain to sub-suppliers |
| 10 | Black Box processes are noted as guaranteed by the sub-supplier, with its evidence attached |
| 11 | Evaluation / measurement technique and gauge number are listed |
| 12 | MSA results for critical gauges meet the requirements and the report is attached |
| 13 | Sample size and frequency match the control type and capability level |
| 14 | Safety characteristics are separately identified and under tightened control |
| 15 | The Reaction Plan contains specific actions, not just “sort out the defects” |
| 16 | The Reaction Plan names an owner and a response time limit |
| 17 | The escalation path of the Reaction Plan to containment / isolation / traceability is defined |
| 18 | Every column's control activity has an owner |
| 19 | The record forms for first-off inspection and in-process checks are in place |
| 20 | Consistency of the Control Plan with the PFMEA, MSA and SPC has been verified |
| 21 | The CP update path on change (ECN / process change) is defined |
| Abbreviation | Full name | Meaning |
|---|---|---|
| CP | Control Plan | The Control Plan, the sixth core tool in the 2024 edition |
| PTC | Pass-Through Characteristic | pass-through characteristics require a control agreement with the customer |
| Safe Launch | Safe Launch | Enhanced containment during the approximately 90-day ramp after production start |
| Black Box | Black Box process | A process whose internal details are invisible to the supplier but which must satisfy the CP |
| LPA | Layered Process Audit | Layered Process Audit verifying that the CP is implemented |
| Reverse FMEA | Reverse FMEA | Work backwards from the shop floor to confirm FMEA / CP coverage completeness |
| Red Rabbit | Red Rabbit samples | Known-defect standard samples used to verify the effectiveness of mistake-proofing |
| Ownership | Owner column | The 11th column heading new in the 2024 Edition |