A rigid body has 6 degrees of freedom in space (3 translations + 3 rotations). Each DOF has two directions, but directions are not DOF — the datum system's job is to constrain these 6 DOF in order and lock the part's posture — The order A | B | C is the order in which the part is located in the assembly: the primary locating face is most stable with the largest contact, then orientation, last position. Also note: a datum is not the actual face of the part but ideal geometry — established by a datum simulator (plate, mandrel, sphere) in maximum contact with the actual datum feature; the gauge's supporting surface is the physical realization of the simulator (expanded in PE-03).
The three roles of a datum
- Assembly datum: which faces/holes locate the part in the assembly
- Inspection datum: what the gauge/CMM uses to simulate
- Machining datum: where the fixture presses
Unifying all three is the gold standard for datum design — if datums are not unified, a 'transformation error' appears in the tolerance stack-up.
Common errors
- Using a non-functional face as A (only because it's easy to machine/measure)
- The datum sequence does not match the assembly sequence
- The datum feature itself has no form tolerance (the datum face is crooked)
- Multiple datum reference frames on one drawing are independent of each other
Primary datum face 3 contact points lock 3 DOF (1 translation + 2 rotations), secondary datum 2 points lock 2 more, tertiary datum 1 point locks the last — this is 3-2-1.
Why 3-2-1 is mandatory
Over-constraint (4 points pressing one face) makes the part 'seesaw' on the gauge — the result depends on how it sits. 3-2-1 guarantees The part has a unique orientation on the fixture: anyone measuring, anywhere, gets the same result. For flexible sheet-metal parts, datum targets (next section) are also needed to fix the 'soft' surface.
Sheet-metal and molded surfaces are naturally uneven. Building a datum on the whole face, the result drifts with the part's deflection posture. Datum targets 'pin' the datum to specified points/lines/surfaces — the gauge supports only these targets, so the posture is unique.
Review Points
① target position should be at Actual contact points of the fixture / assembly; ② point/line/surface target dimensions must be marked (gauge spherical support diameter); ③ targets must not be on free zones that will later deform; ④ non-rigid parts (sheet-metal covers like this) are marked per ISO 10579 distinguishing free state / restrained state — measure the flexure in free state Ⓕ; datum targets usually work with the restrained state.
What is the relation between size and geometric tolerance? That is what the tolerance principle answers — choose wrong and the acceptance conclusion is directly reversed.
| Principle | Meaning | When to use | ⚠ Standard Differences |
|---|---|---|---|
| Independence principle (ISO/GB default) | Size and geometry are accepted independently of each other | When function and size are uncoupled (most scenarios) | ISO/GB default; ASME defaults to the envelope requirement |
| Envelope Requirement Ⓔ | The actual feature must not exceed the maximum material boundary | Limit fit of clearance shaft-hole (guarantee minimum clearance) | ISO requires the Ⓔ symbol explicitly; ASME applies it by default |
| Ⓜ Maximum Material Requirement (MMR) | Geometric tolerance gains bonus when departing from MMC | Hole position of clearance joint (free assembly) | ISO 2692 calls it MMR; ASME calls it MMC |
| Ⓛ Least Material Requirement (LMR) | Bonus at departure from LMC (protect wall/strength) | Guarantees minimum wall thickness and edge distance | ISO 2692 calls it LMR; ASME calls it LMC |
Hole: VC = MMC − t → Ø6.5 − 0.25 = Ø6.25 Shaft: VC = MMC + t
MMB = the MMC boundary of the datum feature (no geometric tolerance; the datum's float range)
MMVB = maximum material virtual boundary of the tolerated feature, MMC ± t (working surface of the fixed GO gauge)Judgement rule of thumb
Assembly must 'fit' → Ⓜ (fit clearance trades for tolerance); function must 'not penetrate wall' → Ⓛ; function independent of size → independence principle; limit fit (min clearance of pin-hole is a hard constraint) → envelope requirement. Ⓜ is prohibited in zero-clearance / interference fits — without clearance there is no physical source of bonus.
Two often-missed points
① Independence ≠ form is uncontrolled — without a marked form tolerance the form error is uncontrolled; back it up with a general tolerance (e.g. ISO 2768-fH) and state it on the drawing; ② ISO 2692 also defines the reciprocity requirement Ⓡ: used together with Ⓜ/Ⓛ, unused geometric-tolerance allowance can flow back to the size tolerance (no such symbol in ASME).
Datum order A→B→C is not a numbering habit; it is the physical order of 'which face rests first, then which, last which is pressed' in gauge / fixture / assembly. Its engineering embodiment is 3-2-1 locating:
| Datum | Constrained degrees of freedom | Contact points | Corresponds on the EV-Box |
|---|---|---|---|
| Primary datum A | 3 translations + rotations | 3 points (largest plane) | Flange sealing face of the frame |
| Secondary datum B | 2 translations + rotation | 2 points (long edge) | One locating edge of the frame |
| Tertiary datum C | 1 translation | 1 point (short-edge end) | One end of the frame |
Swapping A/B reorders the whole tolerance chain and may scrap the gauge. So PE-00 says 'datum order is the GD&T information most easily overlooked by newcomers'.
Gauge input differences: independence vs Ⓜ/Ⓛ (ASME terminology in brackets)
| Principle | Gauge Type | Design input |
|---|---|---|
| Independence (ASME: RFS) | Variable gauge / CMM point-by-point | No boundary; judged by the true value |
| Ⓜ Maximum Material Requirement | Fixed-boundary GO gauge (Ø6.25) | The virtual condition boundary is constant |
| Ⓛ Least Material Requirement | Fixed boundary limit gauge | Used for wall thickness / minimum clearance |
Decision rule of thumb
To 'guarantee assembly' use Ⓜ (fixed GO gauge is cheapest); to 'guarantee minimum wall/strength' use Ⓛ; else default to the independence principle, but don't omit marking and let the supplier interpret.
Advanced annotations: datum shift · simultaneous requirement · common datum
① Datum shift: when the datum feature also carries Ⓜ, the datum may float within its MMB and the tolerated feature's zone shifts with it — automatic under ISO 2692; ASME requires an explicit Ⓜ after the datum letter (e.g. AⓂ). ② Simultaneous requirement: whether several tolerance frames on one DRF must be met simultaneously — ISO defaults to separate requirements and needs the SIM annotation for simultaneity; ASME defaults to simultaneous for a pattern on the same DRF. ③ Common datum A-B: two features (e.g. two coaxial bores) are simulated jointly and share one common axis as a single datum, noted A-B — distinct from the sequential A|B|C datum system.
Take Away in One Sentence
Datum system = Use the assembly sequence to lock the degrees of freedom: A|B|C constrains the 6 DOF in order, 3-2-1 guarantees unique posture, datum targets fix soft surfaces, tolerance principle answers 'who governs size vs geometry'.
Further Reading
- PE-03 Inspection and Verification — how the datum is simulated on the gauge/CMM.
- Standards: ISO 5459 (datum), ISO 2692 (Ⓜ/Ⓛ), ISO 8015 (independence default), GB/T 16671.
© 2026 PanShu / 潘书 · QualEngine | PE-02 training page.